Building frame and related trades workers not elsewhere classified
An AI agent can at least partly carry out 16.1% of the task time of building frame and related trades workers not elsewhere classified, and finish 0.9% alone. The barrier that holds most of the rest back is access to the systems the work runs on.
317th of 433 · interval 10.2–23.2
167th of 433 · interval 0.0–2.8
330th of 433 · interval 14.6–21.8
task statements rated by two models and weighted by importance and frequency. World employment: 3.7 million.
How the tasks rate
What stops the agent
Share of task weight flagged by each barrier; a task can carry several.
| Task statement (O*NET occupation) | Weight | Level | Sonnet · Haiku | Share | Human time | Barriers |
|---|---|---|---|---|---|---|
| Move and set up mobile homes or prefabricated buildings on owners' lots or at mobile home parks.Manufactured Building and Mobile Home Installers | 1.8% | L0 | L0L1 | 10% | 8.0 h | Physical presence, Accountability |
| Inspect, examine, and test the operation of parts or systems to evaluate operating condition and to determine if repairs are needed.Manufactured Building and Mobile Home Installers | 1.6% | L1 | L1L1 | 12% | 1.0 h | Physical presence, Accountability, Access to systems |
| Seal open sides of modular units to prepare them for shipment, using polyethylene sheets, nails, and hammers.Manufactured Building and Mobile Home Installers | 1.6% | L0 | L0L0 | 2% | 1.3 h | Physical presence, Access to systems |
| Reset hardware, using chisels, mallets, and screwdrivers.Manufactured Building and Mobile Home Installers | 1.4% | L0 | L0L0 | 2% | 30 min | Physical presence |
| Confer with customers or read work orders to determine the nature and extent of damage to units.Manufactured Building and Mobile Home Installers | 1.4% | L2 | L2L2 | 42% | 45 min | Physical presence, Trust and care, Access to systems |
| Connect water hoses to inlet pipes of plumbing systems, and test operation of plumbing fixtures.Manufactured Building and Mobile Home Installers | 1.4% | L0 | L0L1 | 4% | 38 min | Physical presence, Accountability |
| Open and close doors, windows, and drawers to test their operation, trimming edges to fit, using jackplanes or drawknives.Manufactured Building and Mobile Home Installers | 1.4% | L0 | L0L0 | 2% | 38 min | Physical presence, Access to systems |
| List parts needed, estimate costs, and plan work procedures, using parts lists, technical manuals, and diagrams.Manufactured Building and Mobile Home Installers | 1.3% | L2 | L2L2 | 68% | 1.8 h | Access to systems |
| Remove damaged exterior panels, repair and replace structural frame members, and seal leaks, using hand tools.Manufactured Building and Mobile Home Installers | 1.3% | L0 | L0L0 | 4% | 3.0 h | Physical presence, Accountability |
| Install, repair, and replace units, fixtures, appliances, and other items and systems in mobile and modular homes, prefabricated buildings, or travel trailers, using hand tools or power tools.Manufactured Building and Mobile Home Installers | 1.2% | L1 | L1L1 | 12% | 2.5 h | Physical presence, Accountability, Access to systems |
| Refinish wood surfaces on cabinets, doors, moldings, and floors, using power sanders, putty, spray equipment, brushes, paints, or varnishes.Manufactured Building and Mobile Home Installers · supplemental task | 1.1% | L0 | L0L1 | 6% | 2.5 h | Physical presence |
| Test combustible appliances, such as gas appliances.Weatherization Installers and Technicians | 1.1% | L0 | L0L1 | 8% | 52 min | Physical presence, Accountability |
| Remove asbestos or lead from surfaces, using hand or power tools such as scrapers, vacuums, or high-pressure sprayers.Hazardous Materials Removal Workers | 1.1% | L0 | L0L0 | 4% | 4.0 h | Physical presence, Accountability, Access to systems |
| Set metal or wooden posts in upright positions in postholes.Fence Erectors | 1.1% | L0 | L0L0 | 2% | 18 min | Physical presence, Access to systems |
| Build containment areas prior to beginning abatement or decontamination work.Hazardous Materials Removal Workers | 1.1% | L0 | L0L2 | 14% | 3.3 h | Physical presence, Accountability, Access to systems |
Show the other 107 tasks
| Task statement (O*NET occupation) | Weight | Level | Sonnet · Haiku | Share | Human time | Barriers |
|---|---|---|---|---|---|---|
| Comply with prescribed safety procedures or federal laws regulating waste disposal methods.Hazardous Materials Removal Workers | 1.1% | L1 | L1L2 | 25% | 1.3 h | Physical presence, Accountability, Access to systems |
| Determine amount of air leakage in buildings, using a blower door machine.Weatherization Installers and Technicians | 1.1% | L1 | L1L1 | 20% | 1.8 h | Physical presence, Accountability, Access to systems |
| Align posts, by lines or sighting, and verify vertical alignment of posts, using plumb bobs or spirit levels.Fence Erectors | 1.1% | L0 | L0L0 | 4% | 12 min | Physical presence |
| Establish the location for a fence, and gather information needed to ensure that there are no electric cables or water lines in the area.Fence Erectors | 1.1% | L1 | L1L2 | 32% | 2.0 h | Physical presence, Accountability, Access to systems |
| Recommend weatherization techniques to clients in accordance with needs and applicable energy regulations, codes, policies, or statutes.Weatherization Installers and Technicians | 1.1% | L2 | L2L2 | 60% | 1.5 h | Physical presence, Accountability, Trust and care, Access to systems |
| Attach fence rail supports to posts, using hammers and pliers.Fence Erectors | 1.0% | L0 | L0L0 | 2% | 15 min | Physical presence |
| Repair leaks in plumbing or gas lines, using caulking compounds and plastic or copper pipe.Manufactured Building and Mobile Home Installers | 1.0% | L0 | L0L1 | 8% | 1.4 h | Physical presence, Accountability, Access to systems |
| Measure and lay out fence lines and mark posthole positions, following instructions, drawings, or specifications.Fence Erectors | 1.0% | L1 | L1L2 | 18% | 1.8 h | Physical presence |
| Identify asbestos, lead, or other hazardous materials to be removed, using monitoring devices.Hazardous Materials Removal Workers | 1.0% | L1 | L1L1 | 18% | 1.3 h | Physical presence, Accountability, Access to systems |
| Prepare hazardous material for removal or storage.Hazardous Materials Removal Workers | 1.0% | L0 | L0L1 | 12% | 1.5 h | Physical presence, Accountability, Access to systems |
| Install copper or plastic plumbing using pipes, fittings, pipe cutters, acetylene torches, solder, wire brushes, sand cloths, flux, plastic pipe cleaners, or plastic glue.Solar Thermal Installers and Technicians | 1.0% | L0 | L0L1 | 5% | 2.5 h | Physical presence, Accountability, Access to systems |
| Prepare and apply weather-stripping, glazing, caulking, or door sweeps to reduce energy losses.Weatherization Installers and Technicians | 1.0% | L0 | L0L1 | 9% | 1.3 h | Physical presence, Accountability, Trust and care, Access to systems |
| Attach rails or tension wire along bottoms of posts to form fencing frames.Fence Erectors | 1.0% | L0 | L0L0 | 4% | 38 min | Physical presence |
| Make minor repairs using basic hand or power tools and materials, such as glass, lumber, and drywall.Weatherization Installers and Technicians | 1.0% | L0 | L0L1 | 12% | 1.5 h | Physical presence, Access to systems |
| Dig postholes, using spades, posthole diggers, or power-driven augers.Fence Erectors | 1.0% | L0 | L0L0 | 2% | 25 min | Physical presence |
| Test operation or functionality of mechanical, plumbing, electrical, and control systems.Solar Thermal Installers and Technicians | 1.0% | L1 | L1L2 | 21% | 1.5 h | Physical presence, Accountability, Access to systems |
| Apply weather seal, such as pipe flashings and sealants, to roof penetrations and structural devices.Solar Thermal Installers and Technicians | 1.0% | L0 | L0L0 | 4% | 42 min | Physical presence, Accountability, Access to systems |
| Test and diagnose air flow systems, using furnace efficiency analysis equipment.Weatherization Installers and Technicians | 1.0% | L0 | L0L1 | 14% | 1.4 h | Physical presence, Accountability, Access to systems |
| Record numbers of containers stored at disposal sites, specifying amounts or types of equipment or waste disposed.Hazardous Materials Removal Workers · supplemental task | 1.0% | L1 | L1L2 | 32% | 25 min | Physical presence, Accountability, Access to systems |
| Install and seal air ducts, combustion air openings, or ventilation openings to improve heating and cooling efficiency.Weatherization Installers and Technicians | 1.0% | L0 | L0L1 | 9% | 3.0 h | Physical presence, Accountability, Access to systems |
| Clean and maintain tools and equipment.Weatherization Installers and Technicians | 1.0% | L0 | L0L0 | 4% | 25 min | Physical presence |
| Install solar collector mounting devices on tile, asphalt, shingle, or built-up gravel roofs, using appropriate materials and penetration methods.Solar Thermal Installers and Technicians | 1.0% | L0 | L0L1 | 6% | 3.0 h | Physical presence, Accountability, Access to systems |
| Locate and repair frayed wiring, broken connections, or incorrect wiring, using ohmmeters, soldering irons, tape, and hand tools.Manufactured Building and Mobile Home Installers | 1.0% | L0 | L0L1 | 10% | 1.0 h | Physical presence, Accountability, Access to systems |
| Maintain activity logs, financial transaction logs, or other records of weatherization work performed.Weatherization Installers and Technicians | 1.0% | L2 | L2L2 | 70% | 45 min | Access to systems |
| Mix and pour concrete around bases of posts, or tamp soil into postholes to embed posts.Fence Erectors | 0.9% | L0 | L0L0 | 2% | 22 min | Physical presence |
| Sort specialized hazardous waste at landfills or disposal centers, following proper disposal procedures.Hazardous Materials Removal Workers · supplemental task | 0.9% | L0 | L0L0 | 6% | 1.3 h | Physical presence, Accountability, Access to systems |
| Identify or separate waste products or materials for recycling or reuse.Hazardous Materials Removal Workers · supplemental task | 0.9% | L1 | L1L2 | 20% | 45 min | Physical presence, Accountability |
| Load or unload materials into containers or onto trucks, using hoists or forklifts.Hazardous Materials Removal Workers | 0.9% | L0 | L0L0 | 4% | 1.0 h | Physical presence, Accountability, Access to systems |
| Apply operation or identification tags or labels to system components, as required.Solar Thermal Installers and Technicians | 0.9% | L0 | L0L1 | 12% | 18 min | Physical presence |
| Apply insulation materials, such as loose, blanket, board, and foam insulation to attics, crawl spaces, basements, or walls.Weatherization Installers and Technicians | 0.9% | L0 | L0L1 | 6% | 3.5 h | Physical presence, Accountability, Access to systems |
| Operate cranes to move or load baskets, casks, or canisters.Hazardous Materials Removal Workers · supplemental task | 0.9% | L0 | L0L0 | 3% | 38 min | Physical presence, Accountability, Access to systems |
| Blast rock formations and rocky areas with dynamite to facilitate posthole digging.Fence Erectors · supplemental task | 0.9% | L0 | L0L1 | 6% | 1.1 h | Physical presence, Accountability, Access to systems |
| Determine locations for installing solar subsystem components, including piping, water heaters, valves, and ancillary equipment.Solar Thermal Installers and Technicians | 0.9% | L2 | L2L2 | 40% | 2.0 h | Physical presence, Accountability, Access to systems |
| Install circulating pumps using pipe, fittings, soldering equipment, electrical supplies, and hand tools.Solar Thermal Installers and Technicians | 0.9% | L0 | L0L1 | 9% | 2.0 h | Physical presence, Accountability, Access to systems |
| Explain recommendations, policies, procedures, requirements, or other related information to residents or building owners.Weatherization Installers and Technicians | 0.9% | L1 | L1L2 | 45% | 30 min | Physical presence, Trust and care |
| Make rails for fences, by sawing lumber or by cutting metal tubing to required lengths.Fence Erectors | 0.9% | L0 | L0L0 | 5% | 20 min | Physical presence |
| Inspect buildings to identify required weatherization measures, including repair work, modification, or replacement.Weatherization Installers and Technicians | 0.9% | L1 | L1L2 | 25% | 2.0 h | Physical presence, Accountability, Access to systems |
| Demonstrate start-up, shut-down, maintenance, diagnostic, and safety procedures to thermal system owners.Solar Thermal Installers and Technicians | 0.9% | L1 | L1L1 | 20% | 1.0 h | Physical presence, Accountability, Trust and care, Access to systems |
| Identify plumbing, electrical, environmental, or safety hazards associated with solar thermal installations.Solar Thermal Installers and Technicians | 0.9% | L1 | L1L2 | 42% | 1.0 h | Physical presence, Accountability, Access to systems |
| Assemble gates, and fasten gates into position, using hand tools.Fence Erectors | 0.9% | L0 | L0L1 | 6% | 1.4 h | Physical presence, Access to systems |
| Nail top and bottom rails to fence posts, or insert them in slots on posts.Fence Erectors | 0.9% | L0 | L0L0 | 2% | 18 min | Physical presence |
| Contact residents or building owners to schedule appointments.Weatherization Installers and Technicians | 0.9% | L3 | L3L3 | 85% | 18 min | Access to systems |
| Complete top fence rails of metal fences by connecting tube sections, using metal sleeves.Fence Erectors | 0.9% | L0 | L0L0 | 2% | 22 min | Physical presence |
| Organize or track the locations of hazardous items in landfills.Hazardous Materials Removal Workers · supplemental task | 0.9% | L2 | L2L2 | 45% | 1.5 h | Physical presence, Accountability, Access to systems |
| Cut, miter, and glue piping insulation to insulate plumbing pipes and fittings.Solar Thermal Installers and Technicians | 0.9% | L0 | L0L1 | 6% | 25 min | Physical presence |
| Perform routine maintenance or repairs to restore solar thermal systems to baseline operating conditions.Solar Thermal Installers and Technicians | 0.9% | L0 | L0L2 | 18% | 2.8 h | Physical presence, Accountability, Access to systems |
| Operate machines or equipment to remove, package, store, or transport loads of waste materials.Hazardous Materials Removal Workers | 0.9% | L0 | L0L1 | 8% | 2.8 h | Physical presence, Accountability, Access to systems |
| Install flat-plat, evacuated glass, or concentrating solar collectors on mounting devices, using brackets or struts.Solar Thermal Installers and Technicians | 0.9% | L0 | L0L1 | 8% | 2.8 h | Physical presence, Accountability, Access to systems |
| Stretch wire, wire mesh, or chain link fencing between posts, and attach fencing to frames.Fence Erectors | 0.9% | L0 | L0L0 | 2% | 2.8 h | Physical presence |
| Apply spackling, compounding, or other materials to repair holes in walls.Weatherization Installers and Technicians | 0.8% | L0 | L0L1 | 4% | 25 min | Physical presence |
| Discuss fencing needs with customers, and estimate and quote prices.Fence Erectors | 0.8% | L2 | L2L2 | 58% | 1.4 h | Physical presence, Trust and care |
| Nail pointed slats to rails to construct picket fences.Fence Erectors | 0.8% | L0 | L0L0 | 2% | 1.3 h | Physical presence |
| Fill water tanks and check tanks, pipes, and fittings for leaks.Solar Thermal Installers and Technicians | 0.8% | L0 | L0L0 | 4% | 52 min | Physical presence, Accountability, Access to systems |
| Insert metal tubing through rail supports.Fence Erectors | 0.8% | L0 | L0L0 | 2% | 18 min | Physical presence, Access to systems |
| Drive trucks or other heavy equipment to convey contaminated waste to designated sea or ground locations.Hazardous Materials Removal Workers · supplemental task | 0.8% | L0 | L0L1 | 6% | 4.0 h | Physical presence, Accountability, Access to systems |
| Assess collector sites to ensure structural integrity of potential mounting surfaces or the best orientation and tilt for solar collectors.Solar Thermal Installers and Technicians | 0.8% | L2 | L2L2 | 40% | 2.0 h | Physical presence, Accountability, Access to systems |
| Explain energy conservation measures, such as the use of low flow showerheads and energy-efficient lighting.Weatherization Installers and Technicians | 0.8% | L2 | L2L3 | 70% | 25 min | Physical presence, Trust and care |
| Design active direct or indirect, passive direct or indirect, or pool solar systems.Solar Thermal Installers and Technicians | 0.8% | L2 | L2L2 | 60% | 4.0 h | Physical presence, Accountability, Access to systems |
| Connect water heaters and storage tanks to power and water sources.Solar Thermal Installers and Technicians | 0.8% | L0 | L0L1 | 6% | 2.3 h | Physical presence, Accountability, Access to systems |
| Clean contaminated equipment or areas for reuse, using detergents or solvents, sandblasters, filter pumps, or steam cleaners.Hazardous Materials Removal Workers | 0.8% | L0 | L0L0 | 4% | 2.5 h | Physical presence, Accountability, Access to systems |
| Wrap air ducts and water lines with insulating materials, such as duct wrap and pipe insulation.Weatherization Installers and Technicians | 0.8% | L0 | L0L0 | 2% | 1.3 h | Physical presence |
| Install plumbing, such as dip tubes, port fittings, drain tank valves, pressure temperature relief valves, or tanks, according to manufacturer specifications and building codes.Solar Thermal Installers and Technicians | 0.8% | L0 | L0L1 | 9% | 2.0 h | Physical presence, Accountability, Access to systems |
| Upload baskets of irradiated elements onto machines that insert fuel elements into canisters and secure lids.Hazardous Materials Removal Workers · supplemental task | 0.8% | L0 | L0L0 | 4% | 40 min | Physical presence, Accountability, Access to systems |
| Install solar thermal system controllers and sensors.Solar Thermal Installers and Technicians | 0.8% | L1 | L1L1 | 15% | 1.8 h | Physical presence, Accountability, Access to systems |
| Prepare or assist in the preparation of bids, contracts, or written reports related to weatherization work.Weatherization Installers and Technicians | 0.8% | L2 | L2L2 | 65% | 1.8 h | Accountability, Access to systems |
| Prepare cost estimates or specifications for rehabilitation or weatherization services.Weatherization Installers and Technicians | 0.8% | L2 | L2L2 | 58% | 2.0 h | Physical presence, Accountability, Access to systems |
| Install monitoring system components, such as flow meters, temperature gauges, and pressure gauges, according to system design and manufacturer specifications.Solar Thermal Installers and Technicians | 0.8% | L0 | L0L1 | 14% | 1.4 h | Physical presence, Accountability, Access to systems |
| Remove or limit contamination following emergencies involving hazardous substances.Hazardous Materials Removal Workers | 0.7% | L0 | L0L1 | 12% | 3.5 h | Physical presence, Accountability, Access to systems |
| Process e-waste, such as computer components containing lead or mercury.Hazardous Materials Removal Workers · supplemental task | 0.7% | L0 | L0L1 | 9% | 1.4 h | Physical presence, Accountability, Access to systems |
| Wrap water heaters with water heater blankets.Weatherization Installers and Technicians | 0.7% | L0 | L0L0 | 2% | 22 min | Physical presence, Access to systems |
| Connect electrical systems to outside power sources and activate switches to test the operation of appliances and light fixtures.Manufactured Building and Mobile Home Installers · supplemental task | 0.7% | L0 | L0L1 | 6% | 1.1 h | Physical presence, Accountability, Access to systems |
| Erect alternate panel, basket weave, and louvered fences.Fence Erectors | 0.7% | L0 | L0L1 | 6% | 6.0 h | Physical presence, Accountability, Access to systems |
| Install heat exchangers and heat exchanger fluids according to installation manuals and schematics.Solar Thermal Installers and Technicians | 0.7% | L0 | L0L1 | 12% | 3.5 h | Physical presence, Accountability, Access to systems |
| Clean mold-contaminated sites by removing damaged porous materials or thoroughly cleaning all contaminated nonporous materials.Hazardous Materials Removal Workers | 0.7% | L0 | L0L1 | 9% | 5.5 h | Physical presence, Accountability, Access to systems |
| Construct and repair barriers, retaining walls, trellises, and other types of fences, walls, and gates.Fence Erectors | 0.7% | L0 | L0L0 | 5% | 8.0 h | Physical presence, Accountability, Access to systems |
| Weld metal parts together, using portable gas welding equipment.Fence Erectors | 0.7% | L0 | L0L0 | 4% | 30 min | Physical presence, Accountability |
| Apply ultraviolet radiation protection to prevent degradation of plumbing.Solar Thermal Installers and Technicians · supplemental task | 0.7% | L0 | L0L1 | 6% | 45 min | Physical presence, Accountability, Access to systems |
| Mix or pour concrete into forms to encase waste material for disposal.Hazardous Materials Removal Workers · supplemental task | 0.6% | L0 | L0L1 | 6% | 1.3 h | Physical presence, Accountability, Access to systems |
| Apply bioremediation techniques to hazardous wastes to allow naturally occurring bacteria to break down toxic substances.Hazardous Materials Removal Workers · supplemental task | 0.6% | L1 | L1L1 | 18% | 3.5 h | Physical presence, Accountability, Access to systems |
| Install storm windows or storm doors and verify proper fit.Weatherization Installers and Technicians | 0.6% | L0 | L0L1 | 8% | 1.0 h | Physical presence |
| Package, store, or move irradiated fuel elements in the underwater storage basins of nuclear reactor plants, using machines or equipment.Hazardous Materials Removal Workers · supplemental task | 0.5% | L0 | L0L1 | 6% | 2.4 h | Physical presence, Accountability, Access to systems |
| Install photovoltaic (PV) systems in accordance with codes and standards, using drawings, schematics, and instructions.Solar Photovoltaic Installers | 0.5% | L0 | L0L1 | 10% | 9.0 h | Physical presence, Accountability, Access to systems |
| Determine materials, equipment, and installation sequences necessary to maximize installation efficiency.Solar Photovoltaic Installers | 0.4% | L2 | L2L2 | 65% | 2.0 h | Accountability, Access to systems |
| Identify electrical, environmental, and safety hazards associated with photovoltaic (PV) installations.Solar Photovoltaic Installers | 0.4% | L1 | L1L2 | 42% | 1.3 h | Physical presence, Accountability, Access to systems |
| Diagram layouts and locations for photovoltaic (PV) arrays and equipment, including existing building or site features.Solar Photovoltaic Installers | 0.4% | L2 | L2L2 | 60% | 2.0 h | Physical presence, Accountability, Access to systems |
| Assemble solar modules, panels, or support structures, as specified.Solar Photovoltaic Installers | 0.4% | L0 | L0L1 | 6% | 1.2 h | Physical presence, Accountability, Access to systems |
| Check electrical installation for proper wiring, polarity, grounding, or integrity of terminations.Solar Photovoltaic Installers | 0.4% | L1 | L1L1 | 15% | 1.5 h | Physical presence, Accountability, Access to systems |
| Install module array interconnect wiring, implementing measures to disable arrays during installation.Solar Photovoltaic Installers | 0.4% | L0 | L0L1 | 9% | 2.8 h | Physical presence, Accountability, Access to systems |
| Apply weather sealing to array, building, or support mechanisms.Solar Photovoltaic Installers | 0.4% | L0 | L0L1 | 8% | 58 min | Physical presence |
| Identify installation locations with proper orientation, area, solar access, or structural integrity for photovoltaic (PV) arrays.Solar Photovoltaic Installers | 0.4% | L2 | L2L2 | 58% | 1.8 h | Physical presence, Accountability, Access to systems |
| Examine designs to determine current requirements for all parts of the photovoltaic (PV) system electrical circuit.Solar Photovoltaic Installers | 0.4% | L2 | L2L2 | 70% | 45 min | – |
| Install required labels on solar system components and hardware.Solar Photovoltaic Installers | 0.4% | L1 | L1L1 | 15% | 52 min | Physical presence |
| Determine appropriate sizes, ratings, and locations for all system overcurrent devices, disconnect devices, grounding equipment, and surge suppression equipment.Solar Photovoltaic Installers | 0.3% | L2 | L2L2 | 68% | 1.8 h | Accountability |
| Test operating voltages to ensure operation within acceptable limits for power conditioning equipment, such as inverters and controllers.Solar Photovoltaic Installers | 0.3% | L1 | L1L2 | 18% | 38 min | Physical presence, Accountability, Access to systems |
| Visually inspect and test photovoltaic (PV) modules or systems.Solar Photovoltaic Installers | 0.3% | L1 | L1L1 | 15% | 1.5 h | Physical presence, Accountability, Access to systems |
| Identify methods for laying out, orienting, and mounting modules or arrays to ensure efficient installation, electrical configuration, or system maintenance.Solar Photovoltaic Installers | 0.3% | L2 | L2L2 | 58% | 2.0 h | Physical presence, Accountability, Access to systems |
| Activate photovoltaic (PV) systems to verify system functionality and conformity to performance expectations.Solar Photovoltaic Installers | 0.3% | L1 | L1L2 | 25% | 2.0 h | Physical presence, Accountability, Access to systems |
| Demonstrate system functionality and performance, including start-up, shut-down, normal operation, and emergency or bypass operations.Solar Photovoltaic Installers | 0.3% | L1 | L1L1 | 15% | 1.5 h | Physical presence, Accountability, Trust and care, Access to systems |
| Determine connection interfaces for additional subpanels or for connecting photovoltaic (PV) systems with utility services or other power generation sources.Solar Photovoltaic Installers | 0.3% | L2 | L2L2 | 58% | 1.5 h | Physical presence, Accountability, Access to systems |
| Identify and resolve any deficiencies in photovoltaic (PV) system installation or materials.Solar Photovoltaic Installers | 0.3% | L1 | L1L2 | 25% | 1.8 h | Physical presence, Accountability, Access to systems |
| Program, adjust, or configure inverters and controls for desired set points and operating modes.Solar Photovoltaic Installers | 0.3% | L1 | L1L2 | 32% | 45 min | Physical presence, Accountability, Access to systems |
| Determine photovoltaic (PV) system designs or configurations based on factors such as customer needs, expectations, and site conditions.Solar Photovoltaic Installers | 0.3% | L2 | L2L2 | 62% | 2.3 h | Physical presence, Accountability, Access to systems |
| Measure and analyze system performance and operating parameters to assess operating condition of systems or equipment.Solar Photovoltaic Installers | 0.3% | L2 | L2L2 | 48% | 1.3 h | Physical presence, Access to systems |
| Compile or maintain records of system operation, performance, and maintenance.Solar Photovoltaic Installers | 0.3% | L2 | L2L3 | 70% | 1.4 h | Accountability, Access to systems |
| Install active solar systems, including solar collectors, concentrators, pumps, or fans.Solar Photovoltaic Installers · supplemental task | 0.3% | L0 | L0L1 | 10% | 10 h | Physical presence, Accountability, Access to systems |
| Select mechanical designs, installation equipment, or installation plans that conform to environmental, architectural, structural, site, and code requirements.Solar Photovoltaic Installers | 0.3% | L2 | L2L2 | 58% | 3.0 h | Physical presence, Accountability, Access to systems |
| Perform routine photovoltaic (PV) system maintenance on modules, arrays, batteries, power conditioning equipment, safety systems, structural systems, weather sealing, or balance of systems equipment.Solar Photovoltaic Installers | 0.3% | L1 | L1L1 | 15% | 2.5 h | Physical presence, Accountability, Access to systems |
Level: consensus of the two models (the lower level when they disagree). Share: part of the task’s working time an agent could take over. Human time: minutes a competent person needs for one instance, as estimated by the models.
Exposure is not delegation
| Measure | Value | Percentile |
|---|---|---|
| ADI (this index) | 16.1% | 27 |
| Eloundou et al. (2024), GPT exposure β | 0.095 | 18 |
| Felten et al. (2021), AI occupational exposure | -1.092 | 16 |
| Webb (2020), AI patent exposure | 53.286 | 45 |
| Eisfeldt et al. (2026), generative AI exposure | 0.112 | 40 |
| Anthropic Economic Index, observed use | 0.003 | 33 |
Earlier indices measure whether AI can touch a task; ADI measures how much of it an agent can carry out from a goal. – : the source does not cover this occupation.
Neighbouring occupations
| Occupation | ADI | % |
|---|---|---|
| House builders 7111 | 77.9 | |
| Air conditioning and refrigeration mechanics 7127 | 25.4 | |
| Carpenters and joiners 7115 | 21.9 | |
| Insulation workers 7124 | 20.6 | |
| Glaziers 7125 | 12.4 | |
| Plumbers and pipe fitters 7126 | 11.5 | |
| Painters and related workers 7131 | 11.4 | |
| Building structure cleaners 7133 | 7.5 | |
| Floor layers and tile setters 7122 | 6.4 | |
| Bricklayers and related workers 7112 | 5.2 | |
| Roofers 7121 | 5.1 | |
| Plasterers 7123 | 4.3 |
Dashed line: building frame and related trades workers not elsewhere classified (16.1%).
Espinal Maya, Cristian, and Santiago Jiménez Londoño. 2026. ADI v2026.1: Agent Delegability Index data, code and MCP server. Zenodo. https://doi.org/10.5281/zenodo.23552918. Record: Building frame and related trades workers not elsewhere classified (ISCO-08 7119), https://balamlabs.org/adi/occupations/7119
@misc{espinal2026adidata,
title = {{ADI} v2026.1: Agent Delegability Index data, code and {MCP} server},
author = {Espinal Maya, Cristian and Jim{\'e}nez Londo{\~n}o, Santiago},
year = {2026},
publisher = {Zenodo},
version = {v2026.1},
doi = {10.5281/zenodo.23552918},
url = {https://doi.org/10.5281/zenodo.23552918},
note = {Record: Building frame and related trades workers not elsewhere classified (ISCO-08 7119)}
}The same record as static JSON, with its citation: /adi/v2026.1/isco/7119.json.